Ipswich Borough Council nominated Columbus Mechanical to act as Principle contractor to complete the design and installation of the new space heating in the sports hall, the choice of which being gas fired radiant tube heaters. A new 125mm MDPE gas main gas to be installed below ground from the new gas meter to satisfy the gas requirements for the new heaters, before a new 108mm stainless steel has main was ran through the building and at high level with the aid of a scissor lift. In order to complete the fluing off the heaters, a scaffold had to be erected, and a man-safe fall arrest system used to install the flues vertically through the roof.