Main contractors Cubitt Theobald were awarded this prestigious project at Latimer House in Felixstowe, with Columbus Mechanical offering the mechanical services and design and installation. With the potential for high water usage and a clear desire for premium experiences throughout, the water supply required careful consideration.
Following a site evaluation, a suitable design and specification was agreed that would fulfil the clients’ requirements and meet their expectations. The design incorporated an Aquaboost twin pump booster set with two Aquastor 500 litre indirect cylinders capable of delivering 150 litres per minute at 4 bar and Remeha Ace boilers.
The combination of the Aquaboost booster set and Aquastor hot water cylinders offers a powerful yet easy to manage solution, promising future-proofed results.





